Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the archi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aflakcoc/public_html/wp-includes/functions.php on line 6121

Design and construction of residential building

Date : May – 2021
Location Tehran city – Dezashib street
employer Mr. NORUZI

Residential building
A construction project with an area of 2150 square meters in 4 floors and 8 residential units with complete facilities and smart systems have been used in its design to reduce energy consumption.

Project specifications

In this project, the latest design method is used to reduce energy consumption and smart technology. With the management of the project team and the use of expert teams in the construction of the project, it is known as a quality residential building in the region.